Continuous cleaning systemSemmelroth
S 50229/2
Continuous cleaning system
Semmelroth
S 50229/2
Ražošanas gads
2021
Stāvoklis
Lietots
(pilnībā funkcionāls)
Atrašanās vieta
Hermaringen 

Pamatdati
- Iekārtas apzīmējums:
- Continuous cleaning system
- Ražotājs:
- Semmelroth
- Modelis:
- S 50229/2
- Iekārtas numurs:
- 20681
- Ražošanas gads:
- 2021
- Stāvoklis:
- gatavs lietošanai (lietots)
- Funkcionalitāte:
- pilnībā funkcionāls
Cena un atrašanās vieta
- Atrašanās vieta:
- Güssenstraße 8, 89568 Hermaringen, Deutschland

Zvanīt
Piedāvājuma informācija
- Sludinājuma ID:
- A22720572
- Atsauces numurs:
- 20211391
- Atjaunināšana:
- pēdējo reizi 09.09.2026
Apraksts
The Semmelroth S 50229/2 is a fully automatic, industrial continuous cleaning system in a timed linear design. It was specifically developed for the demanding cleaning of parts and surface preparation of aluminum and cast parts in industrial multi-shift operations. The system is completely made of stainless steel to ensure maximum corrosion resistance and durability when using aqueous cleaning media.
System and Conveyor Technology
- Transport system: Integrated, automated carrier circulation system.
- Process coupling: Designed for timed linear systems for seamless integration into linked production and robotic cells.
- Carriers: Customer-specific carrier design for precise and repeatable component placement during the process.
Zone Layout and Process Steps
The system goes through a five-stage process chain to meet the highest requirements for particulate and film-like surface cleanliness:
- HD cleaning zone (high pressure): Mechanical pre-cleaning using high-pressure nozzles for targeted removal of chips, machining residues, and stubborn contaminants.
- Cleaning zone (washing): Aqueous main cleaning (spraying/flooding) for chemical degreasing and removal of dirt from the surface.
- Rinsing zone: Downstream rinsing stage for residue-free removal of cleaning agent components from the component surfaces.
- Drying zone: Highly efficient blowing and drying unit for complete removal of residual moisture (prevents staining and corrosion).
- Cooling zone: Targeted component cooling at the end of the process to thermally stabilize the parts for subsequent processes (e.g., metrology, testing, or packaging).
Media preparation, filtration, and peripherals
To ensure long bath life and consistent cleaning quality, the system is equipped with extensive peripheral technology:
- Filtration: Three separate filtration stages (each designed for up to 10 bar) for the cleaning, rinsing, and high-pressure zones.
Blodpfxszzpb Rj Akwjp
- Filter monitoring: Dual differential pressure measurement for automatic detection of the filter saturation level. Oil separation: 1x highly efficient oil separator (Type ÖT 60) for continuous removal of foreign oils from the washing bath.
- Exhaust air management: 1x air-cooled condenser (Type RL 150) for condensation and extraction of process fumes (reduces humidity at the installation site).
- Fluid management: Integrated wastewater piping for cleaning and rinsing tanks, including a robust 1" wastewater pump for emptying.
Safety and System Monitoring
- Process control: Two integrated viewing windows with splash-proof interior lighting for optical monitoring of the cleaning process during operation.
- Environmental protection / emergency protection: Robust drip tray under the entire system, equipped with a leak detection probe for automatic shutdown in the event of media loss.
Technical Performance Data
- Manufacturer: Semmelroth Anlagentechnik
- Model: S 50229/2
- Total connected load: approx. 110 kW
- Material: Stainless steel (V2A / V4A)
Sludinājums tika automātiski tulkots. Iespējamas tulkošanas kļūdas.
System and Conveyor Technology
- Transport system: Integrated, automated carrier circulation system.
- Process coupling: Designed for timed linear systems for seamless integration into linked production and robotic cells.
- Carriers: Customer-specific carrier design for precise and repeatable component placement during the process.
Zone Layout and Process Steps
The system goes through a five-stage process chain to meet the highest requirements for particulate and film-like surface cleanliness:
- HD cleaning zone (high pressure): Mechanical pre-cleaning using high-pressure nozzles for targeted removal of chips, machining residues, and stubborn contaminants.
- Cleaning zone (washing): Aqueous main cleaning (spraying/flooding) for chemical degreasing and removal of dirt from the surface.
- Rinsing zone: Downstream rinsing stage for residue-free removal of cleaning agent components from the component surfaces.
- Drying zone: Highly efficient blowing and drying unit for complete removal of residual moisture (prevents staining and corrosion).
- Cooling zone: Targeted component cooling at the end of the process to thermally stabilize the parts for subsequent processes (e.g., metrology, testing, or packaging).
Media preparation, filtration, and peripherals
To ensure long bath life and consistent cleaning quality, the system is equipped with extensive peripheral technology:
- Filtration: Three separate filtration stages (each designed for up to 10 bar) for the cleaning, rinsing, and high-pressure zones.
Blodpfxszzpb Rj Akwjp
- Filter monitoring: Dual differential pressure measurement for automatic detection of the filter saturation level. Oil separation: 1x highly efficient oil separator (Type ÖT 60) for continuous removal of foreign oils from the washing bath.
- Exhaust air management: 1x air-cooled condenser (Type RL 150) for condensation and extraction of process fumes (reduces humidity at the installation site).
- Fluid management: Integrated wastewater piping for cleaning and rinsing tanks, including a robust 1" wastewater pump for emptying.
Safety and System Monitoring
- Process control: Two integrated viewing windows with splash-proof interior lighting for optical monitoring of the cleaning process during operation.
- Environmental protection / emergency protection: Robust drip tray under the entire system, equipped with a leak detection probe for automatic shutdown in the event of media loss.
Technical Performance Data
- Manufacturer: Semmelroth Anlagentechnik
- Model: S 50229/2
- Total connected load: approx. 110 kW
- Material: Stainless steel (V2A / V4A)
Sludinājums tika automātiski tulkots. Iespējamas tulkošanas kļūdas.
Šie sludinājumi varētu arī jūs ieinteresēt.
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Vācija
1 249 km
Zobratu slīpmašīna
KAPPKX 160 Twin
KAPPKX 160 Twin
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Šveice
1 391 km
STUDER S33 CNC
STUDERS33 CNC
STUDERS33 CNC
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Vācija
1 120 km
Tīrīšanas sistēma
MafacJava
MafacJava
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Metzingen
1 383 km
Zobratu frēzmašīna - horizontālā
MIKRONA 35/36 CNC
MIKRONA 35/36 CNC
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Barcelona
2 351 km
REISHAUER RZ 362 A – CNC zobratu slīpēšanas mašīna
REISHAUERRZ 362 A
REISHAUERRZ 362 A
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Metzingen
1 383 km
Horizontālais apstrādes centrs
HellerMCH 280 C
HellerMCH 280 C
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Vācija
1 120 km
Zobratu apstrādes iekārta
WMWZFWZ 1250/3
WMWZFWZ 1250/3
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Sonnenbühl
1 403 km
5 asu apstrādes centrs
HellerFP 4000
HellerFP 4000
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Dānija
1 391 km
HELLER MCH 250
HELLERMCH 250
HELLERMCH 250
Veiksmīgs
Jūsu ziņojums ir nosūtīts.
Mazā sludinājuma
Wiefelstede
1 122 km
Aukstais ripzāģis
KaltenbachRKT 631 HG
KaltenbachRKT 631 HG
Jūsu sludinājums ir veiksmīgi dzēsts
Radās kļūda

















































































































